PROJECTS

on going projects

CPAVI
  • Client : KCC Property Holdings Inc.
  • Project Name : Gen.Santos Bula Van Terminal
  • Duration : 100 Days 
  • Scope :
    • Air-conditioning
    • Ventilation 
    • Fire Protection
    • Plumbing & Sanitary
  • Client : Century Pacific Agri Ventures Inc.
  • Project Name : Einstein Heat Treatment Facility
  • Duration : 20 Days 
  • Scope :
    • Steam Piping Installation
    • Insulation & Cladding 
  • Client : Century Pacific Food Inc
  • Project Name : TUNA 3
  • Duration : 75 Days
  • Scope :
    • Supply & Install VRF Air-conditioning System
    • Mechanical Ventilation 
    •  
  • Client : Dole Philippines Inc.
  • Project Name : Automatic Fire Sprinkler Syst.
  • Duration : 180 Days 
  • Scope :
    • AFSS Blancher Area
    • AFSS Prep & IQF 2 Area
    • AFSS Biomass Area
    • AFSS Glycol Area
  • Client : Tandem Cedar Cypress Corp.
  • Project Name : Building Maintenance
  • Duration : 320 Days 
  • Scope :
    • Centralized Air-conditioning System
    • Automatic Fire Sprinkler System
    • LPG Pipelines
  • Client : KCC Property Holdings Inc.
  • Project Name : DC Warehouse 
  • Duration : 180 Days 
  • Scope :
    • Air-conditioning
    • Mechanical Ventilation 
    •  
  • Client : Alliance Select Food Intl. Inc
  • Project Name : Retort Area Ventilation
  • Duration : 30 Days
  • Scope :
    • Installation of TDC Ventilating Duct
    • Installation of Blower
  • Client : AKJ Food Venture
  • Project Name : Casa Illonga Marbel
  • Duration : 30 Days
  • Scope :
    • Installation of Kitchen Exhaust Duct
    • Fresh Air Duct
    • Installation of Blowers

completed projects

Partial List Only 

  • Client : Filinvest Land Inc.
  • Project Name : 8 Spatial Davao
  • Duration : 60 Days
  • Location : Maa Road, Davao City
  • Scope :
    • Fire Protection Tapping Bldg 8
    • Genset Wiring Bldg 2-4
    • Sewer & Waterline Utilities Bldg 8
    • Garden Jet Pump
  • Client : Filinvest Land Inc.
  • Project Name : Centro Spatial Davao
  • Duration : 75 Days
  • Location : Bolton Extension Davao City
  • Scope :
    • Pressure Sustaining Valve Assembly
    • PE Pipe Installation
    • Genset Wirings
    • Power Service Entrance Installation
  • Client : Datem Inc.
  • Project Name : Urban Hive Palms Bldg. 6
  • Duration : 365 days
  • Location : Bacaca Road, Davao City
  • Scope :
    • Stair Presurization 
    • Provision of ACU Refrigerant Pipings
    • Kitchen Exhaust Spiral Duct
    • Toilet Exhaust 
  • Client : Dole Philippines Inc.
  • Project Name : Howard Hubbard Memorial Hospital
  • Duration : 160 Days
  • Location : Polomolok, South Cotabato
  • Scope :
    • Automatic Fire Sprinkler System
    • Installation of Fire Pump & Jockey Pump
  • Client : Century Pacific Agri Ventures Inc.
  • Project Name :  Project Einstein
  • Duration : 120 days
  • Location : Brgy. Tambler, Gen.Santos City
  • Scope :
    • Chilled Water Pipe
    • Compress Air Pipe
    • Raw Water Pipe
    • Cooling Tower Pipe
    • Reverse Osmosis Pipe
    • Sump Pit Pipe
  • Client : Biotech Farms Inc.
  • Project Name : Biogas Power Plant
  • Duration : 220 days
  • Location : Banga, South Cotabato
  • Scope :
    • Air-conditioning & Mech. Ventilation
    • Fire Hydrant System
dav
  • Client : KCC Property Holdings Inc.
  • Project Name : Corporate Office
  • Duration : 320 Days
  • Scope :
    • Automatic Fire Sprinkler System
    • Centralized Air-conditioning System
  • Client : Dole Philippines Inc.
  • Project Name : Fireloop Re-routing
  • Duration : 120 days
  • Location : Cannery Road, Polomolok South Cotabato
  • Scope :
    • Fire Protection Pipes re-routing
    • Thrust Block Installation 
  • Client : Dole Philippines Inc.
  • Project Name : DUVO Warehouse 1
  • Duration : 120 days
  • Location : Tubi Allah, Surallah South Cotabato
  • Scope :
    • Automatic Fire Sprinkler System
  • Client : Dole Philippines Inc.
  • Project Name : Revision of Fireloop DUVO
  • Duration : 120 Days
  • Location : Tubi Allah, Surallah South Cotabato
  • Scope :
    • Revision of Fire Protection Pipelines
  • Client : Biotech Farms Inc.
  • Project Name : Biomass Power Plant
  • Duration : 320 Days
  • Location : Tantangan, South Cotabato
  • Scope :
    • Air-conditioning & Mechanical Ventilation
  • Client : Koronadal Commercial Corp.
  • Project Name : STP Ventilation
  • Duration : 320 Days
  • Scope :
    • Installation of Stainless TDC Duct
  • Client : Dole Philippines Inc.
  • Project Name : Pavillon AFSS
  • Duration : 45 Days
  • Location : Polomolok , South Cotabato
  • Scope :
    • Automatic Fire Sprinkler System
  • Client : Dole Philippines Inc.
  • Project Name : Warehouse 2 AFSS
  • Duration : 160 Days
  • Location : Tubi Allah, Surallah South Cotabato
  • Scope :
    • Automatic Fire Sprinkler System
  • Client : General Tuna Corporation 
  • Project Name : Plant Air-conditioning
  • Duration : 30 Days
  • Location : Brgy. Tambler, Gen. Santos City
  • Scope : Supply & Installation (3) 7.5 TR DX Type
    • Local Skinning
    • Big Dome Packing
    • Pouch Room 2
    • Pouch Room 3
    • Main Skinning 

mall tenants serve